001416742 001__ 1416742 001416742 005__ 20231026034812.0 001416742 02470 $$2Handle$$ahttp://hdl.handle.net/20.500.12419/418 001416742 037__ $$aIR 001416742 245__ $$aStudy for the Improvement of the Automated Chemical Equipment Used for the Quantitative Determination of Fluoride at the Alcan Ingot Sebree Plant 001416742 269__ $$a2002 001416742 336__ $$aThesis 001416742 502__ $$bMaster of Science in Industrial Management 001416742 520__ $$aThis problem was defined starting with an evaluation of the present automated method for fluoride determinations at the Alcan Ingot Sebree plant. After evaluation, the problem was recognized as the need for process upgrade or process improvement. Several possible alternatives were discussed and only three analyzed. An economic evaluation of the alternatives selected was performed and the decision was made based on different economic criterions. The economic criterions utilized were the cash analysis by present worth, the cash analysis by uniform annual cost, sensitivity analysis, the payback period, and incremental analysis. The final decision made was to purchase a sampler upgrade to improve the current process. The project activities were also studied using project management tools and the conclusions were that Alcan could finalize this project within this calendar year. 001416742 7001_ $$aMora, Ana E. 001416742 72012 $$aSchultz, David E. 001416742 72012 $$aSprouls, Eric P. 001416742 72012 $$aDay, David 001416742 72012 $$aBosley, Philip B. 001416742 904__ $$a2019-12-09T18:13:47Z$$baccessioned 001416742 904__ $$a2019-12-09T18:13:47Z$$bavailable 001416742 905__ $$a/collection_31/46/dublin_core.xml 001416742 907__ $$aThis problem was defined starting with an evaluation of the present automated method for fluoride determinations at the Alcan Ingot Sebree plant. After evaluation, the problem was recognized as the need for process upgrade or process improvement. Several possible alternatives were discussed and only three analyzed. An economic evaluation of the alternatives selected was performed and the decision was made based on different economic criterions. The economic criterions utilized were the cash analysis by present worth, the cash analysis by uniform annual cost, sensitivity analysis, the payback period, and incremental analysis. The final decision made was to purchase a sampler upgrade to improve the current process. The project activities were also studied using project management tools and the conclusions were that Alcan could finalize this project within this calendar year. 001416742 909CO $$ooai:library.usi.edu:1416742$$pGLOBAL_SET 001416742 980__ $$aIR