Improving Project Management Methods
Digital Assets for Project-Based Studies and Project Management
1 Introduction
2 Literature Review
2.1 Project Management Tools
2.2 Lessons Learned
2.3 Digital Data in Project Management
2.4 Summary
3 Research Methodology
3.1 Conceptual Model
3.2 Systematic Literature Review
3.3 Illustrative Case Study
3.4 Validity and Reliability
4 Research Findings
4.1 Classification Framework
4.2 Article Reference
4.3 Analysis Methods
4.4 Project Artifacts
4.5 Illustrative Cases
5 Discussion
6 Conclusion
6.1 Contribution to Knowledge
6.2 Implication for Practice
6.3 Implication for Research
6.4 Limitations and Further Research
References
Data Quality Model-Based Testing of Information Systems: Two-Level Testing of the Insurance System
1 Introduction
2 Theoretical Background
2.1 Basics of Model-Based Testing
2.2 A Brief Overview on the Existing MBT Approaches
3 Research Methodology
3.1 Algorithm and General Architecture of DQMBT
3.2 Data Quality Model as Testing Model
4 Applying DQMBT to the Insurance Policy System
4.1 Description of the System Under Test
4.2 Expanding DQ-Model into a Tree and Testing Process
4.3 Testing Process
5 Research Findings
6 Discussion on Findings
7 Conclusions
References
Advanced Comprehension Analysis Using Code Puzzle*6pt
1 Introduction
2 Related Works
2.1 Trends and Specific Examples
2.2 Programming Learning by a Code Puzzle
2.3 Schema for Programming Tasks
3 Educational Support Using Behavior
3.1 Overview of the Method
3.2 Collecting Learner Behavior Using Code Puzzles
3.3 Explanatory Variables Collected by the Tool
3.4 Factors of Misunderstanding for Each Learner
3.5 Feedback to Learners and Teachers
4 Experiment
4.1 Creation of Suitable Assignments for Code Puzzles
4.2 Creation of Suitable Code Blocks for Code Puzzles
4.3 Explanatory Variables Collected by the Tool
4.4 Objective and Method of Experiment
4.5 Actual Understanding and Cognitive Load Measurement
4.6 Estimation of Understanding and Distribution of Learners
5 Consideration
5.1 Correlation Between Schema Build and Grade
5.2 Consideration from Important Variables
5.3 Usefulness in Educational Settings
6 Conclusion
6.1 Research Contribution
6.2 Issues and Future
References
Numerical Methods of Solving Management Problems
Wind Farms Maintenance Optimization Using a Pickup and Delivery VRP Algorithm
1 Introduction
2 Literature Review
2.1 Maintenance and Logistics in Wind Farms
2.2 Maintenance Scheduling Optimization
3 Pickup and Delivery VRP with Time Windows
4 Experiments and Discussion
4.1 Basic Setup
4.2 Real Case: Sicilian Wind Farms Scenarios
5 Conclusions and Future Works
References
Preface
Acknowledgment
Organization
Contents
Improving Project Management Methods
Digital Assets for Project-Based Studies and Project Management
1 Introduction
2 Literature Review
2.1 Project Management Tools
2.2 Lessons Learned
2.3 Digital Data in Project Management
2.4 Summary
3 Research Methodology
3.1 Conceptual Model
3.2 Systematic Literature Review
3.3 Illustrative Case Study
3.4 Validity and Reliability
4 Research Findings
4.1 Classification Framework
4.2 Article Reference
4.3 Analysis Methods
4.4 Project Artifacts
4.5 Illustrative Cases
5 Discussion
6 Conclusion
6.1 Contribution to Knowledge
6.2 Implication for Practice
6.3 Implication for Research
6.4 Limitations and Further Research
References
Data Quality Model-Based Testing of Information Systems: Two-Level Testing of the Insurance System
1 Introduction
2 Theoretical Background
2.1 Basics of Model-Based Testing
2.2 A Brief Overview on the Existing MBT Approaches
3 Research Methodology
3.1 Algorithm and General Architecture of DQMBT
3.2 Data Quality Model as Testing Model
4 Applying DQMBT to the Insurance Policy System
4.1 Description of the System Under Test
4.2 Expanding DQ-Model into a Tree and Testing Process
4.3 Testing Process
5 Research Findings
6 Discussion on Findings
7 Conclusions
References
Advanced Comprehension Analysis Using Code Puzzle*6pt
1 Introduction
2 Related Works
2.1 Trends and Specific Examples
2.2 Programming Learning by a Code Puzzle
2.3 Schema for Programming Tasks
3 Educational Support Using Behavior
3.1 Overview of the Method
3.2 Collecting Learner Behavior Using Code Puzzles
3.3 Explanatory Variables Collected by the Tool
3.4 Factors of Misunderstanding for Each Learner
3.5 Feedback to Learners and Teachers
4 Experiment
4.1 Creation of Suitable Assignments for Code Puzzles
4.2 Creation of Suitable Code Blocks for Code Puzzles
4.3 Explanatory Variables Collected by the Tool
4.4 Objective and Method of Experiment
4.5 Actual Understanding and Cognitive Load Measurement
4.6 Estimation of Understanding and Distribution of Learners
5 Consideration
5.1 Correlation Between Schema Build and Grade
5.2 Consideration from Important Variables
5.3 Usefulness in Educational Settings
6 Conclusion
6.1 Research Contribution
6.2 Issues and Future
References
Numerical Methods of Solving Management Problems
Wind Farms Maintenance Optimization Using a Pickup and Delivery VRP Algorithm
1 Introduction
2 Literature Review
2.1 Maintenance and Logistics in Wind Farms
2.2 Maintenance Scheduling Optimization
3 Pickup and Delivery VRP with Time Windows
4 Experiments and Discussion
4.1 Basic Setup
4.2 Real Case: Sicilian Wind Farms Scenarios
5 Conclusions and Future Works
References