TY - GEN N2 - This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel. DO - 10.1007/978-981-16-4107-7 DO - doi AB - This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel. T1 - Shield tunnel cutter replacement technology / AU - Chen, Jian, AU - Min, Fanlu, CN - TA820.C6 LA - eng LA - Translated from Chinese. ID - 1442187 KW - Tunnels KW - Tunneling KW - Tunnels KW - Tunnels SN - 9789811641077 SN - 9811641072 TI - Shield tunnel cutter replacement technology / LK - https://univsouthin.idm.oclc.org/login?url=https://link.springer.com/10.1007/978-981-16-4107-7 UR - https://univsouthin.idm.oclc.org/login?url=https://link.springer.com/10.1007/978-981-16-4107-7 ER -