Chapter 1: Introduction - Trenchless technology in an urban environment
Chapter 2: Greening the urban infrastructure and construction methodologies
Chapter 3: Site investigation techniques for micro-tunnelling via pipe jacking method
Chapter 4: Characterisation and interpretation of geologies for pipe jacking work
Chapter 5: Complex soil-pipe interaction challenges that impact project timeline and deliverables
Chapter 6: Mechanistic behaviour and maintenance challenges of a tunnel boring machine (TBM) affecting jacking performance
Chapter 7: Innovations and challenges faced in construction of deep shafts for TBM launch and retrieval
Chapter 8: Innovative long-distance and curved pipe-jacking drives
Chapter 9: Innovative non-conventional large diameter or non-circular jacking technology
Chapter 10: Advances in damage assessment, rectificaton and maintenance for pipe-jacking works.