001472357 000__ 06587cam\\22006977i\4500 001472357 001__ 1472357 001472357 003__ OCoLC 001472357 005__ 20230908003408.0 001472357 006__ m\\\\\o\\d\\\\\\\\ 001472357 007__ cr\cn\nnnunnun 001472357 008__ 230808s2023\\\\si\a\\\\o\\\\\100\0\eng\d 001472357 019__ $$a1392044719$$a1392345243 001472357 020__ $$a9789819925520$$q(electronic bk.) 001472357 020__ $$a9819925525$$q(electronic bk.) 001472357 020__ $$z9789819925513 001472357 020__ $$z9819925517 001472357 0247_ $$a10.1007/978-981-99-2552-0$$2doi 001472357 035__ $$aSP(OCoLC)1393108156 001472357 040__ $$aGW5XE$$beng$$erda$$epn$$cGW5XE$$dEBLCP$$dYDX 001472357 049__ $$aISEA 001472357 050_4 $$aHD9715.A2 001472357 08204 $$a624.068$$223/eng/20230808 001472357 1112_ $$aAdvances in Construction Materials and Management (Conference)$$d(2022 :$$cWarangal, India) 001472357 24510 $$aAdvances in construction materials and management :$$bselect proceedings of ACMM 2022 /$$cAneetha Vilventhan, Shamsher Bahadur Singh, Venkata Santosh Kumar Delhi, editors. 001472357 2463_ $$aACMM 2022 001472357 264_1 $$aSingapore :$$bSpringer,$$c2023. 001472357 300__ $$a1 online resource (480 pages) :$$billustrations (black and white). 001472357 336__ $$atext$$btxt$$2rdacontent 001472357 337__ $$acomputer$$bc$$2rdamedia 001472357 338__ $$aonline resource$$bcr$$2rdacarrier 001472357 4901_ $$aLecture notes in civil engineering ;$$vvolume 346 001472357 5050_ $$aIntro -- Preface -- Contents -- About the Editors -- Advances in Construction Management -- Gaining Competitive Advantage Using Human Resource Management in Indian Construction Industry -- 1 Introduction -- 1.1 Human Resource Management in Construction -- 1.2 Competitive Advantage -- 2 Literature Review -- 3 Objectives -- 3.1 Research Methodology -- 3.2 Hypothesis Testing -- 3.3 Descriptive Analysis of Responses -- 4 Path Analysis -- 4.1 Inference of Path Analysis -- 5 Recommendation -- 6 Conclusion -- References -- Mapping the Project Complexity of Metro Rail Project Using DEMATEL Technique 001472357 5058_ $$a1 Introduction -- 2 Literature Review -- 2.1 Project Complexity Measurement -- 3 Research Methodology -- 3.1 Complexity in the Context of Bangalore Metro Rail Projects -- 3.2 Application of the DEMATEL Method -- 4 Results and Discussion -- 5 Conclusions -- References -- Contractor Selection Approaches and Pre-qualification Criteria on Construction Projects: A Review -- 1 Introduction -- 1.1 General -- 1.2 Need of the Study -- 1.3 Research Gap -- 2 Literature Survey -- 2.1 Pre-qualification Criteria -- 2.2 Contractor Selection Approaches -- 3 Discussion -- 3.1 Prequalification Criteria 001472357 5058_ $$a3.2 Contractor Selection Approaches -- 3.3 Significant Issues in Contractor Selection Process -- 4 Conclusion -- References -- Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality -- 1 Introduction -- 1.1 General -- 2 Literature Survey -- 2.1 Research Gap -- 3 Methodology -- 4 AR and VR in the Construction Industry -- 4.1 Augmented Reality in Construction -- 4.2 Virtual Reality in Construction -- 5 Case Study -- 5.1 Observations and Results -- 6 Conclusion -- References 001472357 5058_ $$aIdentification of Challenges Influencing the Adoption of Building Information Modelling (BIM) and Facility Management for Metro Rail Projects in India -- 1 Introduction -- 2 Literature Review -- 2.1 Review of the Indian Metro Rail Projects -- 2.2 Overview of BIM in FM Applications -- 3 Research Methodology -- 3.1 Identification of the Challenges of BIM-FM for Metro Rail Projects -- 4 Research Results -- 4.1 Questionnaire Results -- 4.2 Status of BIM Enables FM for Metro Projects Practices -- 5 Discussion and Analysis -- 6 Conclusions and Recommendations -- References 001472357 5058_ $$aEvaluation of Operational Energy for Institutional Building - A Case Study -- 1 Introduction -- 2 Literature Review -- 3 Methodology -- 3.1 Methodology Flow Chart -- 4 Results -- 4.1 All Summer Simulation -- 4.2 Simulation for Hottest Week -- 4.3 Base Case -- 4.4 CASE 1: Change of Lighting (LED) -- 4.5 Case 2 Change of Window Glazing -- 4.6 Case 3 Change of Roof Materials -- 5 Conclusions -- References -- Interactions of Lean and BIM Integrated Augmented Reality in Underground Utility Relocation Projects -- 1 Introduction -- 2 Literature Review -- 3 Methodology 001472357 506__ $$aAccess limited to authorized users. 001472357 520__ $$aThis book presents the select papers from the proceedings of the National Conference on Advanced Construction Materials and Management (ACMM 2022). The book discusses the ongoing research and advanced practices in building materials and construction project management. Various topics covered in the book include new/alternate/supplementary construction materials, deterioration mechanisms in construction materials, microstructure characteristics of concrete, special and recycled aggregate concretes, advanced construction techniques, contracts and arbitration, building information modeling (BIM), prefabricated and modular construction, augmented reality (AR) and virtual reality (VR) in construction management, and artificial intelligence and machine learning in construction. The book is a useful reference for researchers and professionals working in the fields of construction materials and management. 001472357 588__ $$aDescription based on print version record. 001472357 650_0 $$aConstruction industry$$xManagement$$vCase studies. 001472357 650_0 $$aBuilding materials$$vCongresses. 001472357 655_0 $$aElectronic books. 001472357 7001_ $$aVilventhan, Aneetha,$$eeditor. 001472357 7001_ $$aSingh, Shamsher Bahadur,$$eeditor. 001472357 7001_ $$aDelhi, Venkata Santosh Kumar,$$eeditor. 001472357 77608 $$iPrint version:$$aAdvances in Construction Materials and Management (Conference) (2022), creator.$$tAdvances in construction materials and management.$$dSingapore : Springer, 2023$$z9789819925513$$w(OCoLC)1388647447 001472357 830_0 $$aLecture notes in civil engineering ;$$vv. 346. 001472357 852__ $$bebk 001472357 85640 $$3Springer Nature$$uhttps://univsouthin.idm.oclc.org/login?url=https://link.springer.com/10.1007/978-981-99-2552-0$$zOnline Access$$91397441.1 001472357 909CO $$ooai:library.usi.edu:1472357$$pGLOBAL_SET 001472357 980__ $$aBIB 001472357 980__ $$aEBOOK 001472357 982__ $$aEbook 001472357 983__ $$aOnline 001472357 994__ $$a92$$bISE