Items

Details

v. 1. Technical staff analysis reports summary; Summary sequence of events
v. 2. Chemistry; Thermal hydraulics; Core damage; WASH 1400-reactor safety study; Alternative event sequences
v. 3. Selection, training, qualification, and licensing of Three Mile Island reactor operating personnel Technical assessment of operating, abnormal, and emergency procedures; Control room design and performance
v. 4. Quality assurance; Condensate polishing system; Closed emergency feedwater valves; Pilot-operated relief valve design and performance; Containment: transport of radioactivity from the TMI-2 core to the environs; Iodine filter performance; Recovery: TMI-2 cleanup and decontamination.

Browse Subjects

Show more subjects...

Statistics

from
to
Export