Executive summary : final report : Mt. Vernon, Indiana, Ohio River toll bridge feasibility study / prepared for Indiana State Toll Bridge Commission by Moshman Associates, Inc. ; with assistance by Vollmer Assiociates, Inc., traffic engineering, Sverdrup & Parcel Associates, Inc., design engineering.
1979
HE197.I5 M6
Available at Regional History Collection
Items
Details
Title
Executive summary : final report : Mt. Vernon, Indiana, Ohio River toll bridge feasibility study / prepared for Indiana State Toll Bridge Commission by Moshman Associates, Inc. ; with assistance by Vollmer Assiociates, Inc., traffic engineering, Sverdrup & Parcel Associates, Inc., design engineering.
Corporate Author
Moshman Associates.
Alternate Title
Mt. Vernon, Indiana, Ohio River toll bridge feasibility study.
Publication Details
Washington : Moshman Associates, 1979.
Language
English
Description
18, B1-7 leaves : ill. ; 28 cm.
Call Number
HE197.I5 M6
Note
Cover title.
Added Corporate Author
Indiana. State Toll Bridge Commission.
Record Appears in
University Archives & Special Collections > Books and Periodicals
On-Campus Resources > Books
All Resources
On-Campus Resources > Books
All Resources