Linked e-resources

Details

Preface; Acknowledgements; Contents; Abbreviations; 1 Offshore Platform Topsides and Substructure; Abstract; 1.1 Platform Topsides; 1.2 Design of Offshore Platform Topsides and Substructures; 1.2.1 Topsides Design in General; 1.2.2 Modular Topsides, Integrated Topsides and Single Lift Topsides; 1.2.3 Jacket Design; 1.3 Consideration of Construction and Integration of Topsides and Substructure; 1.3.1 Platform Design Strongly Related to the Methodology of Platform Integration; 1.3.2 Impact of Changing Integration Method; References; 2 Platform Integration and Stationing; Abstract

2.1 Self Installable Platform2.1.1 Jack-Ups; 2.1.2 SIP II Platform [9]; 2.1.3 EDP [13-15]; 2.2 Inshore Integration [16]; 2.2.1 Inshore Topsides Integration by Heavy Lifting; 2.2.2 Inshore Platform Integration by Floatover; 2.2.3 Moving-in-Under [23-25]; 2.3 Offshore Integration; 2.3.1 Topsides Installation by HLCV [26, 27]; 2.3.2 Offshore Topsides Installation by Floatover; 2.3.3 Challenges and Development; 2.4 Summary; References; 3 Floatover Technology; Abstract; 3.1 Floatover Concept; 3.2 Advantages of Floatover Method [7-10]; 3.3 Category of Floatover Technology; References

4 HIDECK Floatover TechnologyAbstract; References; 5 UNIDECK and SMARTLEG; Abstract; 5.1 UNIDECK Floatover; 5.2 Comparison UNIDECK to HIDECK; 5.3 UNIDECK Equipment and Operation; 5.4 Advantages of UNIDECK Method Comparing to the HIDECK Method; 5.5 SMARTLEG Installation Method; 5.6 Application of SMARTLEG Technology [9, 10]; References; 6 Catamaran Floatover; Abstract; 6.1 Multi-vessel Floatover; 6.2 "Catamaran Floatover" Origination; 6.3 Catamaran Floatover Technology; 6.3.1 General Discussion; 6.3.2 Catamaran Floatover Categories; 6.4 Technical Challenges; 6.4.1 One Extra Operation Phase

6.4.2 Mating OperationReferences; 7 Project Management and Planning; Abstract; 7.1 Offshore Installation Projects; 7.1.1 Features of T&I Projects; 7.1.2 Project Team and Its Main Functions [5]; 7.1.2.1 HSE (Health, Safety and Environment) Management System; 7.1.2.2 QMS; 7.1.2.3 Communication System; 7.1.2.4 Documentation System; 7.2 Project Management and Project Organizations; 7.2.1 Project Management; 7.2.2 Project Organizations and Organization Charts; 7.3 PM (Project Manager); 7.4 PEP (Project Execution Plan); 7.5 IM (Installation Manual); 7.6 Summary Comments; References

8 Engineering Analysis and Model TestAbstract; 8.1 Engineering Plays a Vital Role in Floatover Projects; 8.1.1 Engineering Team on the Project; 8.1.2 Engineers-Their Quality and Challenges; 8.2 Categories of Engineering Work; 8.2.1 Installation Criteria Set Up; 8.2.2 Analysis and Simulation Supporting Operation Procedure Development; 8.2.3 Floatover Equipment Design and Qualification; 8.2.4 Emergency Handling; 8.2.5 On-Site Supporting; 8.2.6 Model Test; 8.3 Engineering Work Quality Management; 8.3.1 Analysis/Design Philosophy; 8.3.2 DB (Design Basis); 8.3.3 Analysis and Design Procedures

Browse Subjects

Show more subjects...

Statistics

from
to
Export