Organising Committee; Contents; Operation and Maintenance; 1 A Study of AP1000 Nuclear Power Plant SGTR Event Processing Strategy; Abstract; 1 Introduction; 2 SGTR Management Strategy of M310; 3 SGTR Management Strategy of PPWR; 3.1 The Automatic Process to Deal with SGTR of PPWR; 3.2 Simulator Verification on PPWR's Automatic Disposition of SGTR; 3.3 Operators' Intervention and Simulator Verification of SGTR; 3.4 Summary; 4 Comparison; 5 Conclusion; 2 A Summary of the Guidelines on the Evaluation of V & V Tools for Safety Digital I & C Software in Nuclear Power Plant Systems; Abstract.

1 Introduction2 Discussion and Survey Summary; 2.1 RG 1.152; 2.2 RG 1.168; 2.3 RG 1.169; 2.4 RG 1.170; 2.5 RG 1.172; 2.6 RG 1.173; 2.7 DI 2.8 NUREG-0800; 2.9 NUREG/CR-6421; 2.10 IEEE Std 7-4.3.2; 2.11 IEEE Std 603-2009; 2.12 IEEE Std 1012; 2.13 IEEE Std 14102; 2.14 IAEA NS-G-1.1; 3 Conclusions; References; 3 Analysis and Handling of Turbine Eccentricity Anomaly; Abstract; 1 Introduction; 2 A Case of Historic Fault; 3 Root Cause Analysis; 4 Troubleshooting and Handling; 4.1 Temporary Handling During Unit Normal Operation; 4.2 Final Handling During Unit Outage.

4.2.1 The Work Done During OT1084.2.2 Stereotype Mounting Method of Key Phase Sensor in TQNPC; 4.3 Solution; 5 Conclusions; References; 4 Analysis and Summarization of Continuous Spray Test on Pressurizer of Fuqing Nuclear Power Plant Unit 1; Abstract; 1 Preface; 2 Spray Valves Overview; 2.1 Introduction of Pressurizer Spray Pipe; 2.2 Pressurizer Continuous Spray; 2.3 Pressurizer Polarization Spray; 3 Process and Results Analysis; 3.1 Pressurizer Heater Loss Measurements; 3.2 Continuous Spray Flow Regulation; 3.3 Polarization Spray Flow Regulator; 4 Conclusions and Recommendations; References.

5 Analysis of the CRDM Coils Current Interference and the Abnormal Display of Rod Position in RGL SystemAbstract; 1 Introduction; 2 Control Rod CRDM Coil Current Interference; 2.1 Issue Discovering; 2.2 Fault Investigation; 2.3 Solution; 2.4 Effect; 3 Big Unexpected Leap in Rod Position Display the of the Rod Position Measuring System; 3.1 Issue Discovering; 3.2 Fault Investigation; 3.3 Solution; 3.4 Effect; 4 Conclusions; 6 Application of Key Interlock in HUALONG-I 3rd Nuclear Unit; Abstract; 1 Introduction; 2 Key Interlock and Classification; 2.1 Key Interlock; 2.2 Type of Key Interlock.

3 Key Interlock System Design Case Study3.1 Demand of Electrical Design; 3.2 Key Interlock Design Analysis; 3.3 Key Interlock Schematic Design; 4 Conclusions; Reference; 7 Charpy Impact Properties of Electron Beam Welded V-4Cr-4Ti Alloy; Abstract; 1 Introduction; 2 Experimental Procedure; 3 Results and Discussion; 3.1 Microstructure of Weld Zones; 3.2 Impact Tests and Vickers Hardness Tests; 3.3 Fracture Morphology; 3.4 TEM Observation; 4 Conclusions; Acknowledgments; References.