Linked e-resources

Details

Intro
Preface
Contents
About the Editors
Advances in Construction Management
Gaining Competitive Advantage Using Human Resource Management in Indian Construction Industry
1 Introduction
1.1 Human Resource Management in Construction
1.2 Competitive Advantage
2 Literature Review
3 Objectives
3.1 Research Methodology
3.2 Hypothesis Testing
3.3 Descriptive Analysis of Responses
4 Path Analysis
4.1 Inference of Path Analysis
5 Recommendation
6 Conclusion
References
Mapping the Project Complexity of Metro Rail Project Using DEMATEL Technique

1 Introduction
2 Literature Review
2.1 Project Complexity Measurement
3 Research Methodology
3.1 Complexity in the Context of Bangalore Metro Rail Projects
3.2 Application of the DEMATEL Method
4 Results and Discussion
5 Conclusions
References
Contractor Selection Approaches and Pre-qualification Criteria on Construction Projects: A Review
1 Introduction
1.1 General
1.2 Need of the Study
1.3 Research Gap
2 Literature Survey
2.1 Pre-qualification Criteria
2.2 Contractor Selection Approaches
3 Discussion
3.1 Prequalification Criteria

3.2 Contractor Selection Approaches
3.3 Significant Issues in Contractor Selection Process
4 Conclusion
References
Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality
1 Introduction
1.1 General
2 Literature Survey
2.1 Research Gap
3 Methodology
4 AR and VR in the Construction Industry
4.1 Augmented Reality in Construction
4.2 Virtual Reality in Construction
5 Case Study
5.1 Observations and Results
6 Conclusion
References

Identification of Challenges Influencing the Adoption of Building Information Modelling (BIM) and Facility Management for Metro Rail Projects in India
1 Introduction
2 Literature Review
2.1 Review of the Indian Metro Rail Projects
2.2 Overview of BIM in FM Applications
3 Research Methodology
3.1 Identification of the Challenges of BIM-FM for Metro Rail Projects
4 Research Results
4.1 Questionnaire Results
4.2 Status of BIM Enables FM for Metro Projects Practices
5 Discussion and Analysis
6 Conclusions and Recommendations
References

Evaluation of Operational Energy for Institutional Building - A Case Study
1 Introduction
2 Literature Review
3 Methodology
3.1 Methodology Flow Chart
4 Results
4.1 All Summer Simulation
4.2 Simulation for Hottest Week
4.3 Base Case
4.4 CASE 1: Change of Lighting (LED)
4.5 Case 2 Change of Window Glazing
4.6 Case 3 Change of Roof Materials
5 Conclusions
References
Interactions of Lean and BIM Integrated Augmented Reality in Underground Utility Relocation Projects
1 Introduction
2 Literature Review
3 Methodology

Browse Subjects

Show more subjects...

Statistics

from
to
Export