Files

Abstract

The purpose of this project was to complete a redesign of a cargo development project recently completed at O’Hare International Airport (ORD) in Chicago, Illinois with the intent of analyzing how the change of design standards affects the design previously completed on this project. These changes affected the design of the proposed taxi-lane and drainage square yard items. A life cycle cost analysis was also conducted to decide which pavement to use for design. These objectives were completed using present day Federal Aviation Administration (FAA) and Illinois Department of Transportation (IDOT) standards. Overall, this redesign was completed to analyze discrepancies between past/current design standards and how the design would be done differently present-day.

Details

PDF

Statistics

from
to
Export
Download Full History